← All open predictions

Will the FCC issue a final order for Grain Management's 800 MHz spectrum transfer to SpaceX by 2026-12-20?

probability 79% deadline 2026-12-20 (59d left) Regulation

Posted 2026-10-21 — 60 days before the deadline, stated before the outcome.

The Federal Communications Commission (FCC) is the U.S. regulatory body that oversees the allocation and transfer of radio spectrum licenses. Grain Management and SpaceX are entities involved in telecommunications infrastructure, where spectrum rights are critical assets. This question addresses the regulatory timeline for a specific license transfer application.

The claim

The FCC will not have issued a final order granting Grain Management's application to transfer its 800 MHz spectrum licences to SpaceX by 2026-12-20.

Reasoning trace

  1. Parallel: Verizon/SpectrumCo AWS-3 transaction (2012), sim=8
  2. Parallel: AT&T acquisition of Qualcomm 700 MHz spectrum (2011), sim=7
  3. Both secondary-market spectrum transfers took roughly five to eight months from application/announcement to final FCC consent because of public comment and petition-to-deny cycles; the Grain-to-SpaceX transfer application had not even been publicly noticed as of 21 October 2026, so a final consent order by 20 December 2026 would be far faster than the historical pattern.

Evidence so far

3 confirming · 0 denying signals · 1 verified · 2 broken assumptions. The evidence itself is part of the full dossier.

Probability history

Updated 3 times since mint (last on 2026-10-22) — 76% at mint → 79% today.

The full dossier behind this prediction — the evidence trail, the risk analysis, the monetization scenarios — is available on request: [email protected].

Probabilities are calibrated against the system's own resolved history; after the deadline the outcome is resolved and audited — including the calls we get wrong. Nothing on this page is investment advice.