← All open predictions

Saudi Arabia will announce a formal repair timeline or partial restoration of its East-West pipeline by October 15, 2026.

probability 85% deadline 2026-10-15 (14d left) Energy

Posted 2026-09-16 — 29 days before the deadline, stated before the outcome.

The claim

Saudi Arabia will announce a formal repair timeline or partial restoration of its East-West pipeline by October 15, 2026.

Reasoning trace

  1. Saudi East-West pipeline is shut down due to Houthi/Iran-linked attacks
  2. Oil prices surge and European imports are disrupted
  3. Saudi Arabia faces pressure from US and EU allies to restore supply
  4. Saudi officials announce repair timeline or partial restoration

Evidence so far

10 confirming · 0 denying signals · 3 verified · 0 broken assumptions. The evidence itself is part of the full dossier.

Probability history

Updated 14 times since mint (last on 2026-09-30) — 56% at mint → 85% today.

What to watch

  • precondition Saudi Aramco publishes a public statement confirming the cessation of Houthi attacks on the East-West pipeline infrastructure contradicted
  • leading indicator Saudi Aramco publishes its monthly production report showing East-West pipeline throughput exceeding 0 barrels per day contradicted
  • precondition Saudi Arabia announces the resumption of crude oil exports via the East-West pipeline or a specific date for partial restoration. observed

The full dossier behind this prediction — the evidence trail, the risk analysis, the monetization scenarios — is available on request: [email protected].

Probabilities are calibrated against the system's own resolved history; after the deadline the outcome is resolved and audited — including the calls we get wrong. Nothing on this page is investment advice.