← All open predictions

At least one publicly-traded US utility or grid equipment operator announces a material contract cancellation or supply chain restructuring citing Trump's foreign grid equipment executive order before 2026-11-30.

probability 85% deadline 2026-11-30 (60d left) Supply Chain

Posted 2026-08-28 — 94 days before the deadline, stated before the outcome.

The claim

At least one publicly-traded US utility or grid equipment operator announces a material contract cancellation or supply chain restructuring citing Trump's foreign grid equipment executive order before 2026-11-30.

Reasoning trace

  1. Executive order bans foreign-made grid equipment
  2. Utilities audit existing procurement contracts
  3. Material contract cancellation or substitution triggered
  4. 8-K or press release discloses restructuring

Evidence so far

4 confirming · 0 denying signals · 4 verified · 1 broken assumptions. The evidence itself is part of the full dossier.

Probability history

Updated 16 times since mint (last on 2026-09-18) — 70% at mint → 85% today.

What to watch

  • precondition No federal court issues a preliminary or permanent injunction halting the enforcement of the executive order
  • precondition Congress does not pass legislation repealing or superseding the executive order
  • precondition The executive order is signed and published in the Federal Register

The full dossier behind this prediction — the evidence trail, the risk analysis, the monetization scenarios — is available on request: [email protected].

Probabilities are calibrated against the system's own resolved history; after the deadline the outcome is resolved and audited — including the calls we get wrong. Nothing on this page is investment advice.